Settings

Settings
 
 
1

Vendor inspection setting

1. Vendor inspection setting
Check this box if you want to be able to assign inspection rights to the awarded vendor.
2

Allow vendor registration

2. Allow vendor registration
Turn on or off the vendor registration
3

Show setup wizard

3. Show setup wizard
Choose to show the setup wizard or turn it off.
4

Password reuse

4. Password reuse
If set the user will not be able to use the last passwords the system saved.
5

Password reset

5. Password reset
If selected requires the user to change password after it has been reset by the administrator
6

Password expiry

6. Password expiry
Enter the number of days after which all passwords should expire and be renewed. If you don't want the administrator's password to never expire - check the box.
7

Password length

7. Password length
Check this box and enter the minimum number of characters to enforce for all passwords.
8

Password characters

8. Password characters
Check this if you want to force the user to use both upper and lower case characters.
9

Password non-alpha characters

9. Password non-alpha characters
Check this box if you wish to enforce the use of non alpha-numeric characters in all passwords.
10

Assign any user

10. Assign any user
Select yes if you want to be able to assign users other than only the current business unit to a project.
11

No of recent projects

11. No of recent projects
Set the No of recent projects to show when logged in on the My Workspace page.
12

Show external cost calculator

12. Show external cost calculator
Shoe external cost calculator in the pricing reports
13

Base language

13. Base language
Set your base language for iSpec. This is the default language to be used.
14

Show History

14. Show History
Shows the history of clauses, if turned off the History link will not be shown.
15

Show vendor info to TPI

15. Show vendor info to TPI
Allows the Third Party Inspector (TPI) to view all information related to the vendor.
16

Show item estimated cost

16. Show item estimated cost
If turned on the Project manager must enter a estimated cost on all items that require a price.
17

Vendor can view E-bidding chart

17. Vendor can view E-bidding chart
If turned on the vendor can view the price comparison report during E-bidding.
18

Show version 4 of the pricing report

18. Show version 4 of the pricing report
If turned on a slimed down version of the pricing report will also be available aswell as the current version.
19

Require short listed vendor for commercial evaluation

19. Require short listed vendor for commercial evaluation
If switched on you must short list vendors before the commercial evaluations can start.
20

Vendor included in ranking

20. Vendor included in ranking
Select how man vendors evaluation scores show in the evaluation tab.
21

Saving KPI

21. Saving KPI
Sets the default KPI target saving for use in tenders that require E-bidding.
22

Default KPI

22. Default KPI
Set the default  target KPI for use in E-bidding
23

Idle session timeout

23. Idle session timeout
Set the idle session timeout which iSpec will log you out after a period of inactivity.
24

Show Tender ID

24. Show Tender ID
If turned on iSpec will put a unique ID either before or after the tender or template.
25

Prompt for budget and actual cost

25. Prompt for budget and actual cost
If tuned on the project manager will be prompted to enter a budget and actual cost.
26

Document wizard default

26. Document wizard default
Set the default document type when creating a new document. Choose from online or attachment document.
27

Allow cost on non-cost items

27. Allow cost on non-cost items
If turned on the vendor may add a price on non priced items.
28

Excel protection password

28. Excel protection password
Set the default protection password on exported Excel documents.
29

Allow batch acceptance of response

29. Allow batch acceptance of response
If turned on the Project Manager can batch accept all items regardless of the response.
30

Allow awarding to multiple vendors

30. Allow awarding to multiple vendors
If switched on the option to award to multiple vendors is available
31

Import new content during tender preparation

31. Import new content during tender preparation
If turned on content can be imported during tender preparation.
32

Edit document warning during negotiation phase

32. Edit document warning during negotiation phase
if switched on the system will warn the user when editing a document during negotiation phase.
33

Default evaluation type

33. Default evaluation type
Set the default evaluation type for new tenders, this option will only show if the license has the Advanced Evaluation system module.
34

Default currency for new tenders

34. Default currency for new tenders
Set the default currency for new tenders, this option overrides the system currency set in the default variables.
35

Default users

35. Default users
Set the default user to be assigned default user on new records where the current user or administrator cannot be used.
36

Dashboard Variables

36. Dashboard Variables
Set the dashboard variables for future and past events.
Copyright Remy InfoSource Pte Ltd 2018